Visa alla

Se den engelska versionen som vår officiella version.Lämna tillbaka

Europa
France(Français) Germany(Deutsch) Italy(Italia) Russian(русский) Poland(polski) Czech(Čeština) Luxembourg(Lëtzebuergesch) Netherlands(Nederland) Iceland(íslenska) Hungarian(Magyarország) Spain(español) Portugal(Português) Turkey(Türk dili) Bulgaria(Български език) Ukraine(Україна) Greece(Ελλάδα) Israel(עִבְרִית) Sweden(Svenska) Finland(Svenska) Finland(Suomi) Romania(românesc) Moldova(românesc) Slovakia(Slovenská) Denmark(Dansk) Slovenia(Slovenija) Slovenia(Hrvatska) Croatia(Hrvatska) Serbia(Hrvatska) Montenegro(Hrvatska) Bosnia and Herzegovina(Hrvatska) Lithuania(lietuvių) Spain(Português) Switzerland(Deutsch) United Kingdom(English)
Asien/Stilla havet
Japan(日本語) Korea(한국의) Thailand(ภาษาไทย) Malaysia(Melayu) Singapore(Melayu) Vietnam(Tiếng Việt) Philippines(Pilipino)
Afrika, Indien och Mellanöstern
United Arab Emirates(العربية) Iran(فارسی) Tajikistan(فارسی) India(हिंदी) Madagascar(malaɡasʲ)
Sydamerika / oceanien
New Zealand(Maori) Brazil(Português) Angola(Português) Mozambique(Português)
Nordamerika
United States(English) Canada(English) Haiti(Ayiti) Mexico(español)
HemProdukterUtvecklingskort, Kit, ProgrammerareUtvärderingskort - LjudförstärkareTPA2012D2EVM
TPA2012D2EVM Image
Bild kan vara representation.
Se specifikationer för produktinformation.
UTTRYCKSALTERNATIV
Betalningsmetod

TPA2012D2EVM - Texas Instruments

Tillverkare Artikelnummer
TPA2012D2EVM
Tillverkare
Texas Instruments
Allelco Artikelnummer
98D-TPA2012D2EVM
Garanti
1 år Allelco -garanti - Ta reda på mer
Delar beskrivning
EVALUATION MODULE FOR TPA2012D2
Paket
Box
Datablad
1.TPA2012D2EVM.pdf ...

Html -datablad

TPA2012D2.pdf
RoHs status
ROHS3 -kompatibel
Vår certifiering
I lager: 33854
  • Enhetspris: $93.326
  • Delsumma: $0.00

Vill du ha ett bättre pris?
Lägg till i CART och Skicka RFQ nu, vi kommer att kontakta dig omedelbart.

Kvantitet Enhetspris Ext.Pris
1+ $93.326 $93.33
Ovanstående priser inkluderar inte skatter och frakträntor, som kommer att beräknas på beställningssidorna.
UTTRYCKSALTERNATIV
Betalningsmetod
Vår certifiering

Specifikationer

TPA2012D2EVM tekniska specifikationer
Texas Instruments - TPA2012D2EVM Tekniska specifikationer, attribut, parametrar och delar med liknande specifikationer som Texas Instruments - TPA2012D2EVM

Produktattribut Attributvärde  
Tillverkare Texas Instruments  
Spänning - Tillförsel 2.5V ~ 5.5V  
Utnyttjad IC / Del TPA2012D2  
Medföljande innehåll Board(s)  
Serier NanoFree™  
Paket Box  
Produktattribut Attributvärde  
Utmatningstyp 2-Channel (Stereo)  
Max utgångseffekt x Kanaler @ Ladda 2.1W x 2 @ 4Ohm  
Styrelse typ Fully Populated  
Basproduktnummer TPA201  
Förstärkare Typ Class D  

Miljö- och exportklassificeringar

ATTRIBUT BESKRIVNING
RoHs status ROHS3 -kompatibel
Fuktkänslighetsnivå (MSL) 1 (Unlimited)
Nå status REACH Unaffected
ECCN EAR99
HTSUS 8473.30.1180

Delar med liknande specifikationer

De tre delarna till höger har liknande specifikationer som Texas Instruments TPA2012D2EVM.

Produktattribut TPA2012D2EVM TPA2011D1YFFEVM TPA2012D2RTJR TPA2012D2YZHRG4
Artikelnummer TPA2012D2EVM TPA2011D1YFFEVM TPA2012D2RTJR TPA2012D2YZHRG4
Tillverkare Texas Instruments Texas Instruments Texas Instruments TEXAS
Spänning - Tillförsel 2.5V ~ 5.5V 2.5V ~ 5.5V 2.5V ~ 5.5V -
Serier NanoFree™ - - -
Utmatningstyp 2-Channel (Stereo) 1-Channel (Mono) 2-Channel (Stereo) -
Förstärkare Typ Class D Class D - -
Max utgångseffekt x Kanaler @ Ladda 2.1W x 2 @ 4Ohm 3.24W x 1 @ 4Ohm 2.1W x 2 @ 4Ohm -
Medföljande innehåll Board(s) Board(s) - -
Styrelse typ Fully Populated Fully Populated - -
Utnyttjad IC / Del TPA2012D2 TPA2011D1 - -
Paket Box Box Tape & Reel (TR) -
Basproduktnummer TPA201 TPA2011 TPA2012 -

TPA2012D2EVM Datablad PDF

Ladda ner TPA2012D2EVM PDF -datablad och Texas Instruments -dokumentation för TPA2012D2EVM - Texas Instruments.

Html -datablad
TPA2012D2.pdf

Recensioner

Utvärdering: 10 Artiklar

  • Jess***Jones
    2026/04/17

    It offers good value for the price, and the specifications match the description. I’ve been using it for two days with no issues, and I’ll definitely buy it again if I need it in the future.

  • Mich***Smith
    2026/04/17

    Shipping was on time, the component pins are neatly aligned, and I tested 10 of them with a multimeter—all readings were within the specified range. Highly recommended.

  • Aman***arris
    2026/04/3

    It was great—the entire process, from placing the order to receiving the package, went very smoothly. The components were consistent, the price was fair, and I had a very pleasant shopping experience.

  • Mike***nch
    2026/04/3

    Better than expected! The resistance and capacitance readings were spot-on, and it passed the test on the first try. The service was reliable, and the packaging was thoughtful—I highly recommend it.

  • Daic***K.
    2026/03/23

    Very good. No issue after long time testing.

  • Kevi***.
    2026/03/17

    Fast switching and stable output. Very satisfied with this IC

  • Daou***hekebkeb
    2024/06/16

    I had a great experience purchasing items from Allelcoelec, I recommend

  • Uri ***al
    2024/06/19

    Good comunication,
    Transpnt regarding the process and price.

  • Yaqu***l Ali
    2024/06/19

    Providing reasonable prices, regular follow-up of orders, providing accurate and regular invoices, timely delivery of goods, excellent customer service and providing original goods and best quality materials.

  • Lea ***
    2024/06/19

    Morrey was very helpful and right on top of things!
    He replied quickly to my RFQ. He was very courteous and professional.

Skriv en recension

Din e -postadress publiceras inte.

Sändning

Leveranstid

I-lagerföremål kan skickas inom 24 timmar.Vissa delar kommer att arrangeras för leverans inom 1-2 dagar från det datum då alla artiklar anländer till vårt lager.Och Allelco -fartyg beställer en gång om dagen cirka 17:00, utom söndag.När varorna har skickats beror den uppskattade leveranstiden på fraktmetoder och leveransdestination.Tabellen nedan visar är den logistiska tiden för vissa gemensamma länder.

Leveranskostnad

  1. Använd ditt uttryckliga konto för leverans om du har ett.
  2. Använd vårt konto för leveransen.Se tabellen nedan för ungefärliga avgifter.
(Olika tidsram / länder / paketstorlek har olika priser.)

Leveransmetod

  1. Global gemensam leverans av DHL / UPS / FedEx / TNT / EMS / SF vi stöder.
  2. Andra fler fraktvägar, vänligen kontakta din kundchef.

Vanliga länder logistisk tidsreferens
Område Land Logistisk tid (dag)
America USA 5
Brasilien 7
Europa Tyskland 5
Förenade kungariket 4
Italien 5
Oceanien Australien 6
Nya Zeeland 5
Asien Indien 4
Japan 4
Mellanöstern Israel 6
DHL & FedEx leveransavgifter Reference
Leveransavgifter (KG) Referens DHL (USD $)
0,00 kg till 1,00 kg $ 30,00 USD - $ 60,00
1,00 kg 2.00 kg $ 40,00 $ - $ 80,00
2,00 kg-3,00 kg $ 50,00 - $ 100,00 USD
Notera:
Tabellen ovan är endast för referens.Det kan ha vissa dataförspänningar för de okontrollerbara faktorerna.
Kontakta oss om du har några frågor.

Betalstöd

Betalningsmetoden kan väljas från metoderna som visas nedan: Wire Transfer (T/T, Bank Transfer), Western Union, Credit Card, PayPal.

Din trogna leverantörspartner -

Kontakta oss om du har några frågor.

  1. Telefon
    +00852 9146 4856

Certifieringar och medlemskap

Visa mer
TPA2012D2EVM Image

TPA2012D2EVM

Texas Instruments
98D-TPA2012D2EVM

Vill du ha ett bättre pris? Lägg till i CART och Skicka RFQ nu, vi kommer att kontakta dig omedelbart.

0 RFQ
Kundvagn (0 Items)
Det är tomt.
Jämföra lista (0 Items)
Det är tomt.
Respons

Din feedback är viktig!På Allelco värdesätter vi användarupplevelsen och strävar efter att förbättra den ständigt.
Vänligen dela dina kommentarer med oss via vår feedbackformulär, så svarar vi snabbt.
Tack för att du valde Allelco.

Ämne
E-post
kommentarer
Captcha
Dra eller klicka för att ladda upp filen
Ladda upp fil
Typer: .xls, .xlsx, .doc, .docx, .jpg, .png och .pdf.
MAX Filstorlek: 10MB